Once your site, finance, design and statutory approvals are in place, construction can begin. The HebHomes Supply & Erect package is one part of the complete project; your Irish contractor carries out the Remaining Build Works.
The precise sequence varies by site and contract, but most HebHomes projects in Ireland move through these seven stages.
Your main contractor establishes safe access, clears and sets out the site, and coordinates temporary services, drainage and groundworks.
Foundations and the ground-floor build-up are completed to the project engineer’s design. HebHomes confirms the dimensional and access requirements for the kit erection.
HebHomes fabricates the agreed package and coordinates delivery and erection logistics. The site must be ready for articulated vehicles, lifting equipment and safe storage.
The structural timber system is assembled in accordance with the approved technical information. The exact erection scope is the one stated in your HebHomes contract.
Your project team coordinates roofing, cladding or render, flashings, airtightness interfaces and rainwater goods. A membrane-covered structure is not the same as a fully finished façade.
The main contractor and trades complete plumbing, electrics, ventilation, heating, insulation, linings, joinery, kitchens, bathrooms, finishes and external works.
Your Irish design and certification team completes inspections and the building-control documentation. The home should not be occupied until the required completion process has been satisfied.
Responsibility depends on the written scope you choose. HebHomes sells Supply & Erect. The following is the usual division of responsibilities for an Irish project.
Supply + Erect: HebHomes supplies and erects the contracted kit elements. You appoint an Irish main contractor to complete the remaining works.
Partial or Full Turnkey: a separate contractor-led route under a separate building contract, beyond the HebHomes Supply & Erect package. Availability depends on the site, location, scope, programme and contractor capacity. Confirm responsibilities and inclusions in writing.
Indicative Complete Project Cost: the wider project-budget estimate is separate from the HebHomes contract price and is not a fixed Turnkey quotation.
In every case, your quotation and contracts—not a general website description—define exactly what is included, excluded and handed over.
Your contractor should confirm foundations, tolerances, access, hardstanding, scaffolding, lifting space, welfare and storage arrangements before manufacture and transport are committed.
Use your project quotation and contracts to check inclusions, exclusions and handover responsibilities. Review any gaps with HebHomes and your appointed project team before work starts. Our services overview explains the usual roles.
Explore the service options and indicative costs, then speak to us about your site, programme and preferred contractor arrangement.